CASE STUDY: Treatment Systems
In a strategic move to bolster its regional generation capacity and operational resilience, Oklahoma Gas & Electric (OG&E) completed the landmark acquisition of the River Valley Power Plant near Panama, Oklahoma.
While the primary focus of a power plant is electricity generation, the management of its domestic wastewater—the waste generated by its 24/7 workforce—is a critical compliance factor. The existing onsite treatment systems, reaching the end of their functional design life, posed several operational challenges:
The solution was S&L's FAST® Treatment System. To continue with this case study, please complete the form at right.