As the wet well level rises, the L-Series increases the VFD speed in anticipatino of the start speed required for the lead pump (1R).
Once the wet well level reaches the "on" setpoint (3.5 ft.), the lead pump (1R) will begin to pump. The lag pump (2C) will begin to ramp up. |